- Home
- Job guides
- Whole-house repipe
Job guide / plumber, drywall installer
Repiping a house: what drives the cost
A repipe is a labor job. Pipe is cheap next to the hours spent opening walls, threading new lines to every fixture and closing up again. Count fixtures and floors, because that is how plumbers and permit offices both count: Portland charges $128.00 for the first floor of replaced supply lines and $52.00 for each floor above. At the national median plumber wage of $30.67, one worker-day implies roughly $417 to $503 billed.
Start with the count
Walk the house and count every place water comes out: sinks, toilets, tubs, showers, hose bibbs, the washer box, the ice maker, the water heater. Each one is a hot line, a cold line or both, a stop valve and a connection. Then count floors, and note whether the house sits on a slab, a crawlspace or a basement. With those three facts you can already predict which bid will be highest.
What the hours are made of
Access. A single-story house over a crawlspace is the easy case: lines run below and pop up at each fixture. A slab house has to be fed through the attic and down the walls. A two-story house needs chases opened between floors.
Material choice. Flexible tubing snakes through walls with far fewer holes than rigid pipe that must be soldered or glued at every turn. Fewer holes means fewer drywall patches. The pipe price difference matters less than the labor difference.
Occupied house. If you are living there, the crew restores water every evening. That is slower than gutting an empty house.
Who patches. Many repipe bids stop at "walls left open". Patching, texturing and painting is a second trade, priced separately or not at all. Get it in writing either way.
| National wage point | Wage / hr | Loaded / hr | Implied billed hr, 15.5% margin | Implied billed hr, 29.9% margin | One worker-day (8 hr) at 29.9% |
|---|---|---|---|---|---|
| 25th percentile | $24.13 | $34.71 | $41.06 | $49.51 | $396 |
| Median | $30.67 | $44.12 | $52.18 | $62.93 | $503 |
| 75th percentile | $40.92 | $58.86 | $69.62 | $83.97 | $672 |
See plumber wages for every metro.
| National wage point | Wage / hr | Loaded / hr | Implied billed hr, 15.5% margin | Implied billed hr, 29.9% margin | One worker-day (8 hr) at 29.9% |
|---|---|---|---|---|---|
| 25th percentile | $22.81 | $32.81 | $38.81 | $46.80 | $374 |
| Median | $28.33 | $40.75 | $48.20 | $58.13 | $465 |
| 75th percentile | $35.69 | $51.34 | $60.73 | $73.23 | $586 |
See drywall installer wages for every metro.
The drywall wage is shown because the patch work is real money on this job. If the plumbing bid includes patching, ask how many worker-days of each trade it assumes.
Permit lines
| City | Line on the schedule | Fee | Schedule |
|---|---|---|---|
| Portland, OR | Replacing in-building water supply lines, residential, first floor | $128.00 | Plumbing Permit Fee Schedule, effective July 10, 2026 |
| Portland, OR | Replacing in-building water supply lines, residential, each additional floor | $52.00 | Plumbing Permit Fee Schedule, effective July 10, 2026 |
| San Francisco, CA | Category 2PA, plumbing installation for residential construction with 6 or fewer dwelling units, without underground plumbing (water, gas, waste and vent), maximum three inspections | $549 | Table 1A-C, Plumbing/Mechanical Issuance and Inspection Fees, effective July 12, 2026 |
| Grand Rapids, MI | Plumbing permit application, includes 1 inspection | $52.00 | Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026 |
| Grand Rapids, MI | Plumbing: water distribution system, 2 inch | $31.00 | Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026 |
| Reno, NV | Residential EZ permit: water line replacement | $90.00 | EZ Permits and Miscellaneous Fees, effective July 1, 2026 |
San Francisco's Category 2PA line covers water, gas, waste and vent work in small residential buildings and allows up to three inspections. Reno's flat water line fee covers the service line to the house; the interior work is permitted on its own. The inspector will want to see the new lines under pressure before the walls close, so a repipe always has at least one day where nothing can be covered.
Pipe prices
| Series | BLS series ID | Month | Index | 12 months | Since Jan 2020 |
|---|---|---|---|---|---|
| Plastics pipe | WPU07210603 | October 2026 (p) | 178.9 | +3.8% | +66.5% |
| CPI-U, all items, U.S. city average | CUUR0000SA0 | September 2026 | 336.9 | +3.7% | +30.6% |
Reading the bids
Three things to pin down on each one: the pipe material and the fitting system, whether the main shutoff and the line from the meter are included, and the patch scope. Then ask about the drains. A repipe replaces supply lines. Old drain lines are a different job, and a bid that does not say so is leaving you to assume.
Is the pipe the expensive part of a repipe?
No. Producer prices for plastics pipe are 3.8% higher than a year ago, but that swing lands on a small share of the bill. Labor, at a loaded cost near $44.12 an hour for a median plumber, and wall repair carry the job.
How do permit offices price a repipe?
By extent. Portland charges per floor of replaced supply lines. Grand Rapids charges a $52.00 application plus a distribution system fee. San Francisco uses a category fee of $549 for small residential plumbing installations.
Related guides
- Bathroom remodel
- Drywall hanging and finishing
- Gas line installation
- Heat pump water heater installation
- Interior painting
- Lawn sprinkler system installation
Sources
- BLS Occupational Employment and Wage Statistics, May 2025 metropolitan, state and national files
- BLS Employer Costs for Employee Compensation, June 2026, Table 4 (private industry by occupational and industry group)
- NAHB Eye on Housing, Remodelers Saw Profit Margin Gains in 2024 (Remodelers' Cost of Doing Business Study)
- Aswath Damodaran, NYU Stern, Margins by Sector (US), data as of January 2026
- BLS Producer Price Index commodity data and CPI-U, retrieved through the BLS public data API
- Portland, OR: Plumbing Permit Fee Schedule, effective July 10, 2026
- San Francisco, CA: Table 1A-C, Plumbing/Mechanical Issuance and Inspection Fees, effective July 12, 2026
- Grand Rapids, MI: Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026
- Reno, NV: EZ Permits and Miscellaneous Fees, effective July 1, 2026