A bathroom remodel is expensive per square foot because up to five trades each have to mobilize for a small amount of work, in a fixed order, with inspections between. Keeping the toilet, tub and sink where they are is the largest single saving. San Francisco's single-unit plumbing category, which covers a single bathroom remodel, is $290; Portland prices each fixture at $63.00.

Why small rooms cost so much

A general contractor running a bathroom has to get a plumber, an electrician, a drywall finisher, a tile setter and a painter into a room where only one of them can work at a time. Each visit has travel and setup that does not shrink with the room. Several of them have to come twice: rough-in before the walls close, finish after the tile is done. The room is small. The schedule is not.

NAHB's survey of remodelers found trade contractor costs at 30% of remodeler revenue in 2024, down from 36% in 2021. That is across all remodeling; in a bathroom, where almost nothing can be done by a single generalist, expect the subcontracted share to be high.

The decision that sets the budget

Does anything move? A toilet that stays on its existing drain, a tub or shower in the same footprint, and a vanity on the same wall mean the plumber swaps valves and reconnects. Move the toilet and the floor comes up to reroute a large drain with the correct slope, which may mean cutting joists or concrete. Decide this before asking for bids and tell every bidder the same thing.

The second decision is the shower. A tiled shower is its own project inside the project; see the tile shower guide.

The trades and their wages

Plumbers, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the plumber pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$24.13$34.71$41.06$49.51$396
Median$30.67$44.12$52.18$62.93$503
75th percentile$40.92$58.86$69.62$83.97$672

See plumber wages for every metro.

Electricians, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the electrician pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$23.76$34.18$40.43$48.75$390
Median$30.38$43.70$51.69$62.34$499
75th percentile$40.36$58.05$68.67$82.82$663

See electrician wages for every metro.

Tile setters, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the tile setter pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$21.73$31.26$36.97$44.59$357
Median$26.77$38.51$45.55$54.93$439
75th percentile$33.76$48.56$57.44$69.27$554

See tile setter wages for every metro.

Drywall installers, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the drywall installer pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$22.81$32.81$38.81$46.80$374
Median$28.33$40.75$48.20$58.13$465
75th percentile$35.69$51.34$60.73$73.23$586

See drywall installer wages for every metro.

Painters, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the painter pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$21.46$30.87$36.51$44.03$352
Median$23.75$34.16$40.41$48.73$390
75th percentile$29.65$42.65$50.45$60.84$487

See painter wages for every metro.

Read down the median column and you can see why the mix matters. A design heavy on plumbing and electrical changes buys the higher-paid trades' hours. One that keeps the layout and spends on tile buys more hours at a lower rate.

Order of work

Demolition. Framing changes. Plumbing and electrical rough-in. Inspection. Insulation and board. Waterproofing. Tile. Paint. Fixtures, trim and glass. Final inspection. Any trade that misses its slot stalls everyone behind it, which is the real reason bathrooms run long.

Permit lines

Permit fee lines read from each city's published schedule in November 2026. Lines stack: an application or minimum fee usually sits under the item fee, and plan review, state surcharges and re-inspections come on top. Check your own city.
CityLine on the scheduleFeeSchedule
San Francisco, CACategory 1P, single residential unit: water service, sewer replacement, single plumbing fixture, shower pan, or a single kitchen or bathroom remodel (maximum two inspections)$290Table 1A-C, Plumbing/Mechanical Issuance and Inspection Fees, effective July 12, 2026
Portland, ORWater closet, tub/shower/shower pan, sink or lavatory, each$63.00Plumbing Permit Fee Schedule, effective July 10, 2026
Portland, ORBranch circuits without a service or feeder fee: first branch circuit$174.00Electrical Permit Fee Schedule, effective July 10, 2026
Portland, OREach additional branch circuit$21.00Electrical Permit Fee Schedule, effective July 10, 2026
Grand Rapids, MIPlumbing permit application, includes 1 inspection$52.00Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026
Grand Rapids, MIPlumbing: water closet, lavatory or bath tub-shower, each$5.00Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026
Grand Rapids, MIElectrical permit application, includes 1 inspection$52.00Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026
Grand Rapids, MIElectrical: general branch circuit$10.00Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026

Portland's electrical schedule charges $174.00 for the first new branch circuit and $21.00 for each one after. Grand Rapids prices by application plus small per-item fees.

Materials

Producer prices for the main materials on this job. Latest index level for each series, with the change over 12 months and since January 2020. Each row uses the latest month that has a year-earlier reading. (p) marks a preliminary PPI figure; BLS revises indexes for up to four months after first publication. Source: BLS.
SeriesBLS series IDMonthIndex12 monthsSince Jan 2020
Plumbing fixtures and fittingsWPU105October 2026 (p)381.1+6.0%+33.9%
Gypsum productsWPU137October 2026 (p)486.5+0.9%+48.6%
CPI-U, all items, U.S. city averageCUUR0000SA0September 2026336.9+3.7%+30.6%

Comparing bids

Bathroom bids are only comparable when the fixture list is fixed. Write a schedule: tub or shower model, valve, toilet, vanity, faucet, fan, lights, tile by area. Ask each contractor what allowance they carried for anything not yet chosen. Low allowances make low bids and expensive change orders. The FTC's advice to read the contract carefully and make sure it records promises about scope and cost matters more here than on any single-trade job.

What is the cheapest way to cut a bathroom remodel bid?

Leave the drains where they are. Relocating fixtures adds plumber hours, at a national median implied billed rate of $52.18 to $62.93, plus floor and framing work to reach the pipes.

How many permits does a bathroom need?

Usually plumbing and electrical at least, sometimes a building permit if walls move. San Francisco bundles a single bathroom remodel into one plumbing category at $290; other cities add up fixtures and circuits.