What a concrete driveway costs: the pour is the easy day

A driveway bid is concrete volume plus the labor to prepare for it, place it and finish it before it sets. Ready-mix concrete is 40.2% higher at the producer level than in January 2020, which is a large move on the biggest material line. Cement masons and concrete finishers earn a national median of $27.41 an hour, implying $46.64 to $56.24 per billed hour.

Volume first

Concrete is ordered by the cubic yard: length times width times thickness. The thickness is a design choice with a real price attached, since a thicker slab uses proportionally more concrete over the same area. Ask each bidder what thickness they priced and what reinforcement, because two bids for "a driveway" can differ widely in material before anyone has lifted a tool.

The work nobody photographs

Most of a driveway job happens before the truck arrives.

Then the pour. Concrete does not wait. Once the truck starts discharging, the crew has a fixed window to place, screed, float, edge, joint and broom the surface, and that window shrinks in heat and wind. That is why flatwork crews are sized to the pour and why a contractor cannot do your job with one person to save you money. If the truck cannot reach the forms, a pump or wheelbarrows are needed, and both cost.

Finish and extras

A broom finish is standard. Exposed aggregate, color and stamping add materials, time and skill, and they raise the stakes, since a decorative slab cannot be patched invisibly. Control joints are cut or tooled to tell the slab where to crack. Sealing and curing compound are small lines worth having.

Concrete finishers, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the concrete finisher pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$22.60$32.51$38.45$46.37$371
Median$27.41$39.43$46.64$56.24$450
75th percentile$32.15$46.25$54.70$65.97$528

See concrete finisher wages for every metro.

Concrete prices

Producer prices for the main materials on this job. Latest index level for each series, with the change over 12 months and since January 2020. Each row uses the latest month that has a year-earlier reading. (p) marks a preliminary PPI figure; BLS revises indexes for up to four months after first publication. Source: BLS.
SeriesBLS series IDMonthIndex12 monthsSince Jan 2020
Ready-mix concreteWPU1333October 2026 (p)394.8+2.4%+40.2%
Concrete productsWPU133October 2026 (p)410.2+4.1%+48.4%
CPI-U, all items, U.S. city averageCUUR0000SA0September 2026336.9+3.7%+30.6%

Permits

Rules vary a great deal. Many cities require a permit for the driveway apron and curb cut because they sit in the public right of way, and that permit comes from the streets or engineering office, not the building department. Where a building permit applies, valuation schedules like Grand Rapids's work from the contract price:

Permit fee lines read from each city's published schedule in November 2026. Lines stack: an application or minimum fee usually sits under the item fee, and plan review, state surcharges and re-inspections come on top. Check your own city.
CityLine on the scheduleFeeSchedule
Grand Rapids, MIBuilding permit base fee, first $1,000 of construction cost$54.00 plus zoning permit feePlanning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026
Grand Rapids, MIBuilding permit incremental fee, each additional $1,000 of construction cost$6.80Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026

Any excavation should be preceded by a utility locate. 811 is free and wants a few business days of notice.

Comparing bids

Thickness. Base depth and material. Reinforcement. Concrete strength specified on the ticket. Joint spacing. Finish. Removal and disposal included. Who repairs the lawn edge. Get those in writing and the totals will make sense.

Why does the crew size look large for one day?

Because finishing has to happen across the whole slab at once, inside the time the concrete allows. A short-handed pour ends with a poor surface that cannot be fixed afterwards.

How much have concrete prices moved?

The BLS producer price index for ready-mix concrete is 2.4% higher than a year ago and 40.2% higher than in January 2020. Consumer prices overall rose less over the same span, as the CPI row in the table shows.